Please use this Project Information Form (PIF) to apply for a new water service connection, or upgrade or relocate an existing water meter. If you have questions, please call our Engineering Services Department at 415.945.1530, or email EngineeringServices@MarinWater.org.
(This form is compatible with modern desktop and mobile browsers including Microsoft Edge, Google Chrome, Mozilla Firefox, and Apple Safari.)
Existing Improvements (Pre-project)
List all structures with water-using fixtures currently on the property.
Final Improvements (Post-project)
List all structures with water-using fixtures that will be on the property following completion of the project.
Accessory Dwelling Unit (ADU)
Complete this section if your project includes an ADU.
* Enter the maximum number of lawn sprinkler heads used at one time.
Cross-Connection Control: Backflow Prevention
Please be advised a Cross-Connection Survey (inspection) will be conducted at this service address to assess potential hazards to the public and internal drinking water systems. Installation of a testable backflow preventer may be required.
The following items must be considered when designing water systems:
- Backflow Prevention will affect water and fire protection system(s) pressure.
- Backflow prevention is required for all irrigation systems at the point of connection. NOT AT THE METER.
- Other hazards such as radiant heat, swimming pools, and water fountains require Backflow Prevention at the supply line.
- Backflow Prevention installed at the meter requires the installation of a thermal expansion tank.
If you would like a designated survey date and time, please call 415.945.1488 to schedule an appointment. Otherwise, please select a day of the week and appointment window below.