Project | Alpine/Bon Tempe Barge Improvements Project |
Program | Watershed | A1A05 Reservoir/Dam Facilities |
Project Number | D24010 |
Contact | Ava Pridgeon | apridgeon@marinwater.org |
Project Description
This project will install an anchorage and flotation system for 12- and 30-inch high density polyethylene pipelines, as well as an anchoring system for the 200 horsepower pump barges. It will also re-secure electrical and communication lines on the 12- and 24-inch high density polyethylene barge pump lines and connect barge platforms. The work calls for the design and installation of deeper intake suction lines to allow for drawing water at different water depths, replacing overflow sluice gate actuators and providing necessary cathodic protection at Alpine Dam intake tower.
Benefits
These improvements will provide and maintain system integrity for the current barge systems that convey water from Alpine Lake to Bon Tempe Reservoir, ensuring a reliable water supply.
Schedule and Status
Planning: N/A
Design: Summer 2023 - Spring 2024
Construction: Spring 2024 - Summer 2024
Funding Sources
Capital Maintenance Fund |
Other Funding Sources |
Total |
$300,000 |
- |