Glenwood Transmission Pipeline - Fire Flow Improvement Program

ProjectGlenwood Transmission Pipeline Replacement - Fire Flow Improvement Program 
ProgramA2A Fire Flow Improvement Program 
Project NumberF22002
ContactHagar Negash | HNegash@marinwater.org 
Image
Map of pipeline locations off Point San Pedro Rd near Wildcat Lagoon and San Pedro Lagoon
Image
An intersection in a residential area

Project Description 

Installation of approximately 5,400 feet of 12-inch welded steel pipe to replace vulnerable 1954 cast iron pipe to improve fire flow and seismic reliability of the system in this area of San Rafael in support of the District’s Fire Flow Improvement Program. 

Benefits

The benefit of this project is to replace old 1954 cast iron pipe with new 12-inch welded steel pipe to improve fire flow and seismic resiliency of the system. 

Schedule and Status

Design: Fall 2021 - Summer 2023

Construction: Summer 2023 - Fall 2023

Expenditure Schedule

Actuals Through
FY 22 (Rounded)
FY 23
Estimate 
Total
$70,000
$1,600,000
$1,670,000

Funding Sources 

Capital Maintenance Fund 
Fire Flow Improvement Program Fund
Total
-
$1,670,000
$1,670,000